Sitapura tube drawing unit
Jaipur, Rajasthan · Tube drawing and assembly
5,400m²
Capacity
120 km cladding tube per year
Principal equipment
- Pilger mills ×3
- Vacuum annealing
- Class 7 cleanroom
- Eddy-current tube inspection
Fuel assembly components and cladding tubes.
2022
Founded, Jaipur
Banner: a reactor containment building under construction, ringed by tower cranes — industry photography, not Quantum Fuel Technologies’s own site.
Zirconium alloy cladding tubes, spacer grids and end plugs, drawn and assembled under a dedicated contamination-control regime. Quantum is the newest entrant in the directory and is still completing its profile.
How this organisation is classified on the register — and therefore how buyers find it.
A lapsed certificate is shown as lapsed rather than passing as valid.
1 site, 5,400 m² under roof. This is the section buyers read closest.
Jaipur, Rajasthan · Tube drawing and assembly
5,400m²
Capacity
120 km cladding tube per year
Principal equipment
Enquiries reach Arjun Sethi, Founder. You need an INF membership to send one — any individual tier, or a company package.
Related
Matched on category, capability and sector — across the trade, not just alongside it.
EPC contractor
Balance of plant and civil delivery on two new-build sites.
Research organisation
A 40 MW research reactor and an isotope production facility.
Operator
Fleet spares and outage services across the Gulf.