Chennai pre-assembly yard
Chennai, Tamil Nadu · Modular pre-assembly
58,000m²
Capacity
Pre-assembly for two concurrent sites
Principal equipment
- 400 t crawler crane
- Pipe spool shop
- Module skidding system
Balance of plant and civil delivery on two new-build sites.
1992
Founded, Gurugram
Banner: two reactor containment domes at an operating nuclear station — industry photography, not Trident EPC Projects’s own site.
EPC contractor delivering the balance of plant and civil scope on two new-build sites. The vendor development group qualifies second-source suppliers for long-lead items and runs a standing pre-qualification process open to the directory.
How this organisation is classified on the register — and therefore how buyers find it.
What this organisation is buying, published to the register.
Construction and erection
Standing pre-qualification for the balance-of-plant scope on two new-build sites: switchgear, cabling, piping, erection and inspection. Open to the directory and reviewed quarterly.
Standards ISO 19443 · IEC 61439-2
Applications New-build balance of plant
A lapsed certificate is shown as lapsed rather than passing as valid.
1 site, 58,000 m² under roof. This is the section buyers read closest.
Chennai, Tamil Nadu · Modular pre-assembly
58,000m²
Capacity
Pre-assembly for two concurrent sites
Principal equipment
Project references published by the organisation. The strongest thing on any profile.
Civil, structural, mechanical and electrical balance-of-plant delivery
Enquiries reach Harpreet Singh Bedi, Head of Vendor Development. You need an INF membership to send one — any individual tier, or a company package.
Related
Matched on category, capability and sector — across the trade, not just alongside it.
Manufacturer
ASME III pressure equipment and heavy fabrication for reactor islands.
Manufacturer
Safety-related valves and actuators, qualified to Class 1.
Testing & inspection
NABL-accredited inspection, NDT and in-service examination.